Walk-in showers, frameless glass, heated floors, custom tile, smart lighting. Full bathroom renovations across Ottawa — finished in 3-4 weeks, fixed-price quotes, no change-order surprises.

The most expensive mistakes in bathroom renovation aren't the materials — they're what's behind the wall. Improper waterproofing, undersized vents, missed joints, wrong-grade backer board: all of these fail invisibly for 18-36 months, then turn into mold, rot or warranty claims that cost more than the original job.
We build every Ottawa bathroom the same way: Schluter Kerdi or RedGard waterproofing membranes, properly vented exhaust to the exterior, GFCI-protected wet zones to current Ontario code, and pressure-tested plumbing before tile goes down. The finish you see is the easy part.
Walk-in shower, soaker tub, double vanity, heated floors. Typical: 3-4 weeks.
Tub-shower combo, single or double vanity, durable kid-proof finishes.
Statement tile, designer vanity, accent lighting. Typical: 1-2 weeks.
New plumbing rough-ins, sump-pump integration, full waterproofing.
Curbless or curbed, linear drain, frameless glass, niche storage.
Curbless showers, grab-bar blocking, lever taps — accessibility-first design.

The waterproofing, ventilation and code work nobody sees — and what makes a bathroom last 25 years instead of 5.
On-site walkthrough, measurements, scope discussion.
3D mockup, fixture & tile selection, fixed-price quote.
Demo, rough-ins, waterproofing, tile, finishes — 3-4 weeks.
Walkthrough, manuals, 5-year warranty in writing.
Master Ensuite
Whole Floor
Powder RoomWe respond within one business day with a site-visit window. Site visits and written quotes are free.