Real per-square-foot numbers from Ottawa projects — not national averages — plus the five things that move your quote and the one question that exposes every lowball bid.
If you collect three quotes for an interlock project in Ottawa this year, you will probably get three very different numbers — sometimes $10,000 apart for the same driveway. This guide gives you the real 2026 ranges we see across hundreds of Ottawa projects, the five things that move a price up or down, and the one question that exposes every lowball bid.
These are honest Ottawa ranges for properly engineered work — full excavation, compacted HPB base, geotextile, polymeric sand, written warranty. You can find cheaper. What you cannot find is cheaper with the same base, and the base is the part that decides whether the surface survives its fifth winter.
Ask every contractor the same question: "Write down my excavation depth and base material." A legitimate quote says "12 inches, HPB limestone, compacted in 4-inch lifts." A lowball quote goes vague — "standard base," "industry spec." The excavation line is where cheap bids hide, because it is the most expensive step and the one you will never see once the pavers are down.
Want a real number for your address? We do free on-site estimates across Ottawa with an itemized fixed-price quote within one business day. Request yours here.
We respond within one business day with a site-visit window. Site visits and written quotes are free. No high-pressure sales — ever.